MeeFog AC Condenser Pre-Cooling System Provides 16-Month Return on Investment

A Los Angeles art museum needed an energy-efficient way to add precisely controlled humidity to its gallery. The 120,000-square-foot building holds 2,000 works of art. Two floors of gallery space are served by 7 air handling units. The Meefog system includes a redundant pump unit that will Click to Learn…

Comments Off on MeeFog AC Condenser Pre-Cooling System Provides 16-Month Return on Investment

Texas Truck Factory Installs MeeFog Humidification
& Water Treatment in Cleanroom

When a truck manufacturer in Texas needed an industrial-grade humidification system to mitigate dust and contaminates in their factory cleanroom, they turned to MeeFog.  MeeFog installed humidification systems on four AHUs using two Model Mee-3 fog pump racks. An RO water treatment system was also provided that will serve both…

Comments Off on Texas Truck Factory Installs MeeFog Humidification
& Water Treatment in Cleanroom

American Electrochromatic Smart Glass Manufacturer Installs MeeFog™ Humidification

A smart glass factory in Minnesota that has a humidity-sensitive manufacturing process, installed a MeeFog system for two air handlers. Maintaining control of relative humidity is helpful for dust suppression and mitigating electro-static discharge in clean room environments. It also aids in the electrochromic coating and laminating process of this specialized type of glass pane…

Comments Off on American Electrochromatic Smart Glass Manufacturer Installs MeeFog™ Humidification

Iowa State University Builds First Gold LEED Certified Chemistry Lab
 

In 2011, ISU’s Hach Hall became the first chemistry building in the country to achieve LEED Gold certification from the Green Building Council. Chemistry laboratory AHUs have high humidity loads, and because of the need to continually exhaust any fumes, they operate at 100% outside air driving up energy costs. The MeeFog™…

Comments Off on Iowa State University Builds First Gold LEED Certified Chemistry Lab
 

Kentucky College Installs MeeFog™ RO, Humidification, and Exhaust Cooling 

High-pressure adiabatic system that provides humidification on 4 air handlers during humidification season, as well as evaporative cooling for the exhaust air on 4 heat recovery units during cooling season. Redundant pumps provided for critical humidification zones.Mee Industries' scope of work included the supply of the reverse osmosis system, fog pump skid, staging…

Comments Off on Kentucky College Installs MeeFog™ RO, Humidification, and Exhaust Cooling 

Protecting Priceless Art with MeeFog™ Humidification

North Carolina Museum of Art (NCMA) was experiencing wide daily fluctuations in humidity of +/- 15% in the winter and up to +/- 30% in the summer. In order to host high-profile traveling exhibitions, NCMA needed to tightly control the humidity in the galleries. After careful review of the facilities,…

Comments Off on Protecting Priceless Art with MeeFog™ Humidification

Energy Efficient MeeFog™ System Allows Amherst College to Humidify the New Science Center   

Amherst College in Massachusetts needed an energy-efficient way to add humidity to five air handling units (AHUs) and four heat recovery units (HRUs). They installed a MeeFog™ system consisting of one pump rack with dual 5 GPM pump units, 5 hp motors, VFD & pressure transducer. The pump units are mounted on one…

Comments Off on Energy Efficient MeeFog™ System Allows Amherst College to Humidify the New Science Center   

MeeFog Boosts Data Center Efficiency with Fogging Technology

OneNeck Data Center in Madison, Wisconsin wanted to cut energy costs but still needed a system that would meet its Tier 3 reliability requirements. MeeFog™ designed a system that resulted in a significant efficiency improvement while satisfying both of the data center’s primary goals. OneNeck switched from a standard electric heat…

Comments Off on MeeFog Boosts Data Center Efficiency with Fogging Technology