Air Wise recently installed a highly specialized custom air handling unit (AHU) on the roof of a healthcare facility, with full support from the factory and Coward Environmental Systems, Inc. (CESI). Bryan McManus, Sales Engineer at CESI, played a hands-on role in the project and emphasized the detailed planning, close coordination, and strong factory involvement that ensured the installation’s success.
A Rigorous Factory Witness Test

“We tested every single component. The factory was extremely accommodating,” McManus said. “We passed all of our factory tests, which increased the customer’s confidence substantially.”
Impressive On-Site Factory Support
After passing inspection, the unit was shipped and temporarily staged at a crane yard due to winter weather. But Air Wise didn’t just deliver the unit—they stayed hands-on throughout the entire process.

“When the unit arrived, I was on site with the Air Wise factory team. We were the ones who cut the wrapping off the unit and inspected everything right there,” McManus said. “There were some parts that everyone knew would need to be reinstalled on site—like condenser fans—and I was out there with the factory team moving and installing them. They stuck with us for six straight days.”
The Air Wise team didn’t just assist with installation; they helped verify electrical connections between segments, performed on-site testing, and conducted training for the facility’s maintenance staff.
“I’ve been doing this for 16 years,” McManus noted, “and I’ve never seen factory support like this. To have three or four guys from Air Wise on site for nearly a week, doing whatever the customer needed—it was remarkable.”

Engineering Around Complexity
Air Wise designed the AHU as a fully custom unit—not a simple off-the-shelf system. It featured 18 stages of DX cooling, gas furnaces for heating, and steam generators for humidification, all tailored to meet the demands of a highly sensitive hospital environment.

“This is a full-blown custom AHU,” McManus said. “It’s got a climate-controlled vestibule, a fan wall for redundancy, and 18 stages of DX. Integrating the controls was one of the biggest concerns. There were a lot of components—steam, gas, compressors—so we had to be extremely thorough.”

The gas train had to be carefully checked for proper orifices and regulators. Meanwhile, the team monitored integration between the building controls and the AHU’s 18-stage compressor system to ensure seamless transitions between part-load and full-load demands.

All Aluminum Construction
The unit’s all-aluminum construction provided added benefits beyond performance. It reduced overall weight, allowing for a smaller crane and easier lift logistics, while also providing a clean, corrosion-resistant finish suited for a rooftop.
“Aluminum makes a big difference,” McManus said. “It’s corrosion-resistant, so it holds up better over time, especially in harsh rooftop environments. And because it’s lighter than traditional materials, it made the lift much easier and allowed us to use a smaller crane.”
This weight reduction also translates to less structural load on the building, which can be especially important for retrofits or rooftop applications in healthcare settings where structural capacity is limited. Additionally, the sleek, professional appearance of aluminum played well with the hospital’s aesthetic standards, delivering both function and form in a single package.
Efficient Delivery Despite Seasonal Delays
Though the total project spanned a full year from initial design to final commissioning, the unit itself was delivered in under 30 weeks—a remarkably fast turnaround given the system’s complexity. “This is not a standard unit off a shelf,” McManus noted. “We’re talking about a fully custom air handler with 18 stages of DX cooling, gas furnaces, steam humidification, and an all-aluminum build. Delivering something like that in under 30 weeks is extremely impressive.”
Much of the additional time in the project timeline was due to environmental factors rather than production delays. Once the unit was ready, it spent nearly four months staged at a crane yard while the project team waited for a safe weather window for installation. Snow, ice, and unpredictable winter conditions made it too risky to coordinate the rooftop lift. “We were ready in January,” McManus explained. “But with unpredictable snow and rain, the team made the smart call to wait for a safe install window.” Prioritizing safety and precision, the team ensured that the installation was executed without compromise—ultimately contributing to a smooth, successful outcome.
A Model for Future Installations
From rigorous factory testing to on-site collaboration, the project sets a high bar for factory support in the HVAC industry.
“The construction manager told me this went as smoothly as it possibly could have,” McManus said. “And that’s because Air Wise didn’t just build a great unit—they showed up and stood by it.”
Interested in customized HVAC solutions for your facility?
If your project demands more than an off-the-shelf solution, CESI is ready to deliver. From complex custom air handling units to fully integrated on-site factory support, CESI works closely with leading manufacturers like Air Wise to ensure your HVAC systems meet the highest standards of efficiency, reliability, and performance.
Whether you’re designing for a hospital, research lab, commercial building, or specialized facility, our team brings deep technical expertise, responsive service, and a commitment to doing the job right—from concept to commissioning. Contact us today to learn how CESI and Air Wise can bring unparalleled quality, collaborative support, and peace of mind to your next project.

